We produce electricity through the combustion of fuel derived from waste.
Address: via Valle Porchio, 03040 San Vittore del Lazio (FR)
Opening hours: Mon-Fri 07:00 am - 07:00 pm, Sat 07:00 am - 04:00 pm
Phone: 06 57 997 800
Send an e-mail
3 independent waste-to-energy lines to serve the territory of Lazio region.
Installed thermal power (line 1)
Installed thermal power (lines 2 & 3)
Installed electrical power (line 1)
Installed electrical power (lines 2 & 3)
The plant is included in the regional waste disposal plan
Once the fourth line has been completed, the industrial site will be able to recover energy from up to 447,200 tonnes/year of waste, while ensuring the continuous and simultaneous operation of three co-incineration lines.
At present, with only the three lines currently in operation, the maximum amount of fuel that can be used for energy recovery is 397,200 tonnes/year.
San Vittore Waste-to-Energy Plant is recognized as a strategic facility of national interest for the protection of health and the environment.
Its relevance stems from both the cutting-edge technologies used in its construction and the significant waste treatment capacity that makes it a reference point in the sector.
People employed
MWh of electricity generated
tonnes of fuel processed
Data as of 31 December 2025
View real-time emissions data monitoring
This page provides the minimum information required by ARERA Resolution No. 387/2023/R/RIF, with the aim of ensuring clear, easily accessible communication for users delivering waste. It also provides the contact channels for communicating with our plants.