One of the most important plants among those we manage, it uses only waste material from paper to generate electrical energy.
1 waste-to-energy line for the national territory.
Installed thermal power (MWt)
Installed electrical power (MWe)
Electrical energy generated from photovoltaic (MWh)
Authorized capacity for energy recovery (tonnes per year)
Data as of December 31, 2024
The plant is equipped with photovoltaic panels that power the site itself.
During 2023 the photovoltaic plant generated approximately 436 MWh of electrical energy. Of these, approximately 55% was used for the energy needs of the facility, while the remaining portion was fed into the electrical grid, benefiting the community.
In 2024, Terni Waste-to-Energy Plant returned to operation starting from May 2024, following revamping works that affected the flue gas treatment plant.